20 Year Old System Retrofit

Project Summary

The client visited our retail store, noticed the Franklin battery system, and asked about it. They then hired us to install a full home battery backup system and upgrade their existing solar panels.

Our Approach

We took a two-step approach. First, we installed two Franklin aPower 2 batteries to provide full-property backup during power outages, while also giving the client mobile monitoring of their solar production. Then, after they saw how much their 20-year-old panels had degraded, we upgraded the system with new 450-watt bifacial panels made by CertainTeed. On day one, peak production jumped from 2 kW at noon to 5 kW.

Challenges

The corrugated metal roof was our biggest challenge and the primary cause of delays. It’s difficult to walk on, let alone carry and install panels safely.

Service Provided

A list of the specific services we delivered for the project, such as:
1

PG&E Usage history evaluation

2

Franklin Whole Home Battery Backup aPower 2 Batteries

3

Certainteed 450Watt Bi-Facial Solar Panels

20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit
20 Year Old System Retrofit